Description
Mitsubishi MSZ-GS18VF Product Introduction
Energy Efficiency Label: Level 1
Maintenance period: 2 years
Registration and maintenance method: Please register online for warranty within ten days after purchase, https://www.mitsubishielectric.com.hk/customer-services/warranty?cat=0
Composite nano antifouling coating
Open cleaning design
Anti-mildew filter (air filter)
Particle capture filter (optional)
Electrostatic antibacterial enzyme filter (optional)
Independent computer dehumidification
Frequency conversion control
somatosensory control
sleep mode
Silent design
Up and down air supply (automatic swing)
Left and right air supply (manual operation)
24-hour preset switch
LED backlight remote control
Remote control illuminated button
Remote control fault code display
protect the circuit
Automatic restart^
self diagnosis
CN104 and CN105 wireless network terminal connectors
Anti-corrosion blue coating (outdoor unit)
model:
Indoor unit: MSZ-GS18VF
Outdoor unit: MUZ-GS18VF
Cooling/heating capacity:
Rating: 5.00/4.50 kW
17,060/15,354 BTU/h
Minimum and maximum values: 1.90-5.20/1.40-4.55 kW
6,483-17,742/4,777-15,525 BTU/h
Power consumption:
Rating: 1.67/1.20 kW
Minimum and maximum values: 0.39-2.10/0.28-1.20 kW
Operating current: 7.7/5.5 A
Air flow: 16.3/15.1 m³/min.
Energy efficiency value: 2.99/3.75
Dehumidification power: 1.28 I/h
Noise value:
Indoor unit (silent)/low-high: 31-46 dB(A)
Outdoor unit: 55/56 dB(A)
Dimensions (H x W x D):
Indoor unit: 305x923x250 mm
Outdoor unit: 420x730x310 mm
net weight:
Indoor unit 12.5 kg
Outdoor unit 28kg
Refrigerant pipe diameter:
Liquid/Gas: φ6.35/φ9.52 mm
Maximum piping size:
Height difference / length: 20 meters
Voltage: 220V
Phase/Frequency: Single Phase/50 Hz
Refrigerant type: R32
Origin: Thailand
==Remarks==
1. Basic 2-horse split installation costs $1,600 (including 15-foot snow hose and 15-foot drain hose)
2. Extra-long snow hose $150, extra-long water drain $20, not including shed (about $3200), aluminum frame $550, 3. Glass sealing $500, old machine disassembly $500, shock-absorbing glue $200, frequency conversion cable $300, chassis $500 4 . High-altitude work (need to visit the site), other engineering fees are extra, and will be confirmed after checking the location.
5. The inspection fee of $100 will be refunded if the project is done
6. The scaffolding fee must be quoted after checking the location.
*All installation fees are charged by the installer and have nothing to do with our company